Abstract This paper is a problem solution analysis on Harrison-Keyes implementation plan. A generic benchmarking was conducted to help identify challenges in the
selection, multiple alternatives for each opportunity are identified. Consideration is given to generic benchmarking analysis previously conducted for Harrison-Keyes.
priorities will set the end state behind meeting the market schedule. Astrium do not use the free slack approach, but tracks the timeline of deliverables very close.
could have otherwise have impacted the critical path and the entire project completion. While free slack can be leveraged to absorb unplanned events that impact the
for top level management and lower percentage for production staff. Acceptance by the employees of Harrison-Keyes will depend largely on the percentage cut and union