/essays/Quality-Parts-Case-Study/100642
OPPapers.com Essay Index >> Business >> Quality Parts Case Study
We have many free term papers and essays on Quality Parts Case Study. We also have a wide variety of research papers and book reports available to you for free. You can browse our collection of term papers or use our search engine.
Quality Parts Case Study. Week Four Case Study Quality Parts Company Anthony
Decker Operations Management OSC301 University of Phoenix ...
case study of one heat recovery ventilators manufactory. ... Our planet manager, Patrick,
discovered a serious quality problem with ... 60 % of the 3,400 parts used in ...
Midas Case Study. Qualifiers: Midas’s qualifiers include: (1) Speed; (2) Specialisation
of services; (3) Price; (4) Trust/Reliability; (5) Quality parts; (6 ...
... CASE STUDY A : DELL COMPUTER CORPORATION Introduction Michael Dell ... using branded
name components and parts enhanced the quality and performance of Dell ...
... Case Study With the constant change in demand ... dictates that resources, labor, parts
and equipment ... increases productivity, performance and quality while reducing ...
Submitted by occsmbre on November 27, 2006
Category: Business
Words: 1004 | Pages: 5
Views: 749
Popularity Rank: 9,281
Average Member Grade: N/A (Add a Comment / Grade this Paper)
Week Four Case Study
Quality Parts Company
Anthony Decker
Operations Management OSC301
University of Phoenix
6 December 2004
Week Four Case Study
In the case study of the factitious company, Quality Parts Company (QPC), QPC supplies gizmos for a computer manufacturer located a few miles away. Although the text states that QPC manufactures only two models of gizmo, it also states that manufacture for models X and Y start at machine 2, the lathe, while model Z requires milling at machine 1. Based on the latter information, this analysis will assume that the former is a mistake, and rely on the three model scenario. The company produces two different models of gizmos in production runs ranging from 100 to 300 units.
Figure 1. QPC Workflows
The manager of Quality Parts Company has been contemplating installing an automated ordering system to help control inventories and to “keep the skids filled.” (She feels that two days of work in front of a workstation motivates the worker to produce at top speed.) She is also planning to add three inspectors to clean up the quality problem. Further, she is thinking about setting up a rework line to speed repairs. Although she is pleased with the high utilization of most of her equipment and labor, she is concerned about the idle time of the milling machine. Finally, she has asked the industrial engineering department to look into high-rise shelving to store parts coming off machine 4.
OPERATION NUMBER AND NAME OPERATION TIME (MIN) SETUP TIME (MIN)
Milling for Model Z 20 60
1. Lathe 50 30
2. Mod. 14 drill 15 5
3. Mod 14 drill 40 5
4. Assembly step 1
Assembly step 2
Assembly step 3 50
45
50
5...
You must Login to view the entire paper.
If you are not a member yet, Sign Up for free!