QUALITY ISSUES IN PROJECT MANAGEMENT. QUALITY ISSUES IN PROJECT MANAGEMENT
1. Introduction There are a number of issues surrounding ...
... and tracking system will also enhance the quality of the ... The new project management
and tracking system will also enhance the issues tracking process. ...
... the PMBOK® in the context of resolving quality problems ... Issues are major problems
that can impede the project but ... outside the total control of the project team ...
... There are also quality issues. ... to complete the project on time and with the quality
necessary to ... due to the fact that CS has changed its project management team ...
... issues to project manager. • Production of technical documentation to agreed quality
standards. • Reporting configuration and deployment. Issue Management ...
Submitted by jcvene on May 20, 2008
Category: Science
Words: 926 | Pages: 4
Views: 108
Popularity Rank: 91,864
Average Member Grade: N/A (Add a Comment / Grade this Paper)
QUALITY ISSUES IN PROJECT MANAGEMENT
1. Introduction
There are a number of issues surrounding the general area of “quality” in project management. You will need to be aware of some of the requirements of PRINCE (or PRINCE2) as well as the more general aspects of the ISO 9000 and 14000 series.
2. Quality requirements as part of PRINCE
PRINCE2 (Projects in Controlled Environments) was revised from PRINCE in 1996 and is the accepted standard for the control of projects in the computing area of the public sector. It is also widely used outside this sector as a way of formalising project control procedures.
It lays down 8 key processes concerning (content generally obvious):
1. Directing of the project.
2. Planning of the project
3. Starting the project
4. Initiating the project
5. Controlling a stage of the project
6. Managing product delivery
7. Managing the stage boundaries
8. Closing the project
This could be how any project is organised, of course. But the standard itself lays down a lot of bureaucratic detail about the level and structure of the documentation required.
As part of this procedure there is:
A quality log: a record of any checks carried out on the process (with signatures).
An issues log: a record of any issues which arose from the quality log entries.
A risk log: showing how risks are allocated and subsequently dealt with and by whom.
Of course, despite the adoption of PRINCE2 procedures (or any other procedures) ... projects do still “fail”! (In bucket loads – see the press over a couple of months)
The following web pages may be of interest:
http://www.ogc.gov.uk/methods_prince_2.asp Government source page.
http://www.pmtoday.co.uk General PM info.
...
You must Login to view the entire paper.
If you are not a member yet, Sign Up for free!