Preview

Material Requirement Planning (Mrp)

Satisfactory Essays
Open Document
Open Document
570 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Material Requirement Planning (Mrp)
Material Requirement Planning (MRP)

1

Material Requirements Planning (MRP)

2

Material Requirements Planning
• Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed to produce a product • MRP provides time scheduling information specifying when each of the materials, parts, and components should be ordered or produced • Dependent demand drives MRP • MRP is a software system

Materials Requirements Planning (MRP)
• Computer based system • Explodes Master Schedule (MPS) into required amounts of raw materials and subassemblies to support MPS • Nets against current orders and inventories to develop production and purchased material ordering schedules

4

Evaluation of MRP
• Most beneficial to process-focused systems that have long processing times and complex multistage production steps • Lead times must be reliable • Must freeze MPS for some time before actual production • Difficult to implement
5

Objectives of MRP
• Improve customer service • Reduce inventory investment • Improve plant operating efficiency

6

7

Firm orders from known customers

Aggregate product plan

Forecasts of demand from random customers

Engineering design changes

Master production Schedule (MPS)

Inventory transactions

Bill of material file

Material planning (MRP computer program)

Inventory record file

Secondary reports
Primary reports Planned order schedule for inventory and production control Exception reports Planning reports Reports for performance control
©The McGraw-Hill Companies, Inc., 2004

Master Production Schedule (MPS) • Time-phased plan specifying how many and when the firm plans to build each end item
Aggregate Plan Aggregate Plan (Product Groups) (Product Groups)

MPS (Specific End Items)

Terms used in MRP
• • • • • • • • • • Bill of Material File Bucket Capacity Requirement Planning Inventory Status File End Item Lumpy Demand Net

You May Also Find These Documents Helpful

  • Powerful Essays

    Materials Requirement Planning is an integral part of any manufacturing based business. According to The Free Dictionary’s definition of materials requirement planning is that this system “provides the user with information about timing (when to order) and quantity (how much to order), generates new orders, and reschedules existing orders as necessary to meet the changing requirements of customers and manufacturing” (2009). This definition of materials requirement planning illustrates the importance of having an excellent system in place to make certain that ordering needed materials is done in an orderly fashion that allows for the needed materials to be on hand, but will not result in an instance of having…

    • 1520 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Riordan Manufacturing

    • 390 Words
    • 2 Pages

    The Manufacturing Staff completes inventory usage form indicating the type and quantity of raw materials used for manufacturing and assembly…

    • 390 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    OPS/571 week 4

    • 402 Words
    • 2 Pages

    Next, we need to use this information to determine projected inventory, master production schedule (MPS), and ATP.…

    • 402 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    A master production schedule is used by business organizations as a metric to ascertain whether or not their production (outputs) meets their supply demands (inputs). There are times when a business wants to have a surplus and at others letting inventory dwindle to smaller numbers is optimal. The idea is to ensure that customers get their orders in a timely manner to retain loyalty, maximize profits, and reduce overhead and direct costs. The Realco Breadmaster Company has a new bread maker in the hopes of increasing their revenue. In question is the cost and efficiency of the new bread maker. The owner of Realco, Johnny Chang, wants a Master Production Schedule (MPS) designed.…

    • 2134 Words
    • 9 Pages
    Better Essays
  • Good Essays

    Q2: What are aggregate: capacity planning (ACP), master product scheduling (MPS) and shop floor scheduling?…

    • 691 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    EDI Reference Guide

    • 298 Words
    • 1 Page

    Materials management manages its inventory with the data entered regarding supply usage. An integrated system forecasts needed supplies based on scheduled cases. This information minimizes the required inventory levels…

    • 298 Words
    • 1 Page
    Satisfactory Essays
  • Better Essays

    This will include the amount, cost, inventory max level, inventory minimum level, and supplier information. You may also specify a warehouse location for the supplies to be stored so they can be found easily.…

    • 3336 Words
    • 14 Pages
    Better Essays
  • Better Essays

    Robinson, E., Sahin, F., & Gao, L. (2008). Master production schedule time interval strategies in make-to-order supply chains. International Journal Of Production Research, 46(7)…

    • 1115 Words
    • 7 Pages
    Better Essays
  • Better Essays

    The master production schedule (MPS) at Riordan determines what parts will be needed on a weekly basis to meet the quarterly projected needs. Because Riordan uses a make-to-stock system, they are easily able to satisfy customer demand without production delays. A fixed-order quantity inventory method is used with an automated system to order parts when inventory levels drop to a determined level. A flexible time fence is utilized, as capacity remains unremarkable, and the majorities of Riordan’s suppliers are reliable and do not cause significant delivery…

    • 685 Words
    • 3 Pages
    Better Essays
  • Satisfactory Essays

    Illustrious Case

    • 334 Words
    • 2 Pages

    The key inputs to implement a Material Requirement Planning come from three sources: a Bill of Materials (BOM), a Master Production Schedule and Inventory Records. The Bill of Materials contain information on every item or assembly required to produce end items, this includes raw materials, component parts, and subassemblies. The Master Production Schedule anticipates how much of each item is wanted and when is wanted. The Master Production Schedule is developed from forecasts and firm customer orders for end items, safety stock requirements, and internal orders. The Inventory Records provides information of how much inventory is already on hand or on order, and thus should be substracted from the material requirements. These records must be kept up to date.…

    • 334 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The objective of this course is to familiarize students with the major tools used for manufacturing planning and control. To this end, we will perform an in-depth analysis of integrated operations management systems with emphasis on operations planning and control, material requirements planning, master scheduling, forecasting, capacity planning, just-in-time and related topics. These tools will be covered with more detail than previous SCM courses and we will examine how the various components fit together to form a complete system.…

    • 2563 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    Silver E, Pyke D, Peterson R., 1998. Inventory Management and Production Planning and Scheduling, third edition. John Wiley & Sons, New York.…

    • 11337 Words
    • 46 Pages
    Powerful Essays
  • Powerful Essays

    Club Med Essay

    • 1347 Words
    • 6 Pages

    MRP starts with customer orders and forecast demand (see p. 439). Analyse how your case company gets data about (potential) future orders, and indicate which of the two sources above is more important.…

    • 1347 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    Realco Breadmaster Company

    • 1027 Words
    • 5 Pages

    Inventory is the stock of items used to support production, supporting activities and customer service. It is the “bread and butter” that keeps manufacturing firms in business, and is a critical resource in the supply chain. Inventory can be manually managed so that different business conditions can have less of a negative impact on the operations, and give support to the efficient running of supply chains. There are also many tools that companies use to manage production, such as the master scheduling, the material requirements planning (MRP), job sequencing, and distribution requirements planning (DRP). Now with all that said, let us now begin the review and analyze the first case study about the Realco Breadmaster Company.…

    • 1027 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Operating Plan * Activity Chart * Process Flow Chart * Materials requirements * Man power requirements…

    • 1867 Words
    • 8 Pages
    Powerful Essays