1. I recommend that the Rugged Boot assembly line be rearranged to provide a more efficient process. Based on the diagram provided by Catherine Pang showing the layout of the production line, the current line uses eight stations. I determined the efficiency by using the following formula:

Efficiency = _____________Σ Task times___________________ (actual number of work stations) x (largest cycle time)

The total task time for the work boot assembly is 46 minutes. The actual number of work stations is currently 8 and the largest cycle time is 10 minutes. Based on these numbers the assembly line is operating at 57.5% efficiency. To determine how to better improve the assembly line efficiency, it is important to first determine the minimum of work stations needed. This can be done by using the following formula:

Minimum of Workstations = Σ for Task i Cycle time To find Cycle time the following formula is used:

Cycle Time = Production Time Available Per Day Units Required Per Day

Based on the information provided by Alistair Wu of a 40 hour work week and 6 work boots per hour we can conclude that the cycle time is 10 minutes per unit (480 minutes per day / 48 work boots per day). With that being said using the formula above, we can conclude that the minimum number of workstations required for the work boot assembly line is 4.6 or 5 stations. Reducing the number of stations from 8 to 5 would provide a drastic improvement in proficiency from 57.5% up to 92%. To verify my results and determine how the stations should be arranged I used POM for Windows Assembly Line Balancing Module. The results from POM are attached. In summary I recommend that station 1 will have Task A. Station 2 will have Tasks B and C. Station 3 will have Task D. Station for will have Tasks F, E, and G. Station 5 will have Task H. a. A copy of the output from POM is attached as part A. i. I chose this



References: Heizer, J. H., & Render, B. (2010). Operations management (10th ed.). Upper Saddle River, N.J.: Prentice Hall.

You May Also Find These Documents Helpful

  • Better Essays

    Russell, R., & Taylor, B. (2011). Operations management. (7th ed.,p.233, p. 246). John Wiley &…

    • 1795 Words
    • 8 Pages
    Better Essays
  • Better Essays

    JGT Task 1

    • 1830 Words
    • 6 Pages

    The recommendation is that management reorganizes the production process down to five stations, with appropriate tasks in each station to produce the required work boots.…

    • 1830 Words
    • 6 Pages
    Better Essays
  • Good Essays

    WGU JGT Task #1

    • 1134 Words
    • 5 Pages

    Catherine Pang, Line Manager, provided an existing Rugged Work Wear® boot assembly schedule (precedence diagram) denoting times at each station and a layout of the production line.…

    • 1134 Words
    • 5 Pages
    Good Essays
  • Better Essays

    JGT2 ALL

    • 10845 Words
    • 44 Pages

    produces 6 workboots in one hour with a 40 hour work week making this the most appropriate layout for the…

    • 10845 Words
    • 44 Pages
    Better Essays
  • Good Essays

    Leadership and Team

    • 9120 Words
    • 37 Pages

    Heizer, J & Render, B. (2008) Principles of operations management seventh edition. New Jersey: Pearson Education Inc.…

    • 9120 Words
    • 37 Pages
    Good Essays
  • Satisfactory Essays

    References: Heizer, J. & Render, B. (2008) Operations Management and Principles of Operations Management. PowerPoint presentation, 7th Edition. Prentice Hall, Inc., Upper Saddle River, N.J. 07458…

    • 435 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Supply Chain Management

    • 7320 Words
    • 30 Pages

    Heizer, Jay and Barry Render. Operations Management. 10th ed. Prentice Hall, 2011. Retrieved from http://wpscms.pearsoncmg.com…

    • 7320 Words
    • 30 Pages
    Good Essays
  • Powerful Essays

    Stonehaven Case Analysis

    • 1913 Words
    • 8 Pages

    For this part of the analysis, consider each department in the Gdansk factory in isolation. Assume that the rest of the production system has no impact on the department you are considering. Assume that material handling times are negligible and ignore variability in processing times.…

    • 1913 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    Assembly Line Design

    • 525 Words
    • 3 Pages

    The following tables give the tasks, task times, and predecessors that are to be performed on an…

    • 525 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    Ergonomics in assembly line

    • 2393 Words
    • 10 Pages

    [2] Battini D., Faccio M., (2011), “New methodological framework to improve productivity and ergonomics in assembly system design”,…

    • 2393 Words
    • 10 Pages
    Best Essays
  • Satisfactory Essays

    Desired Cycle Time

    • 108 Words
    • 2 Pages

    A company is setting up an assembly line to produce 192 units per eight-hour shift. The following table identifies the work elements, items, and immediate predecessors.…

    • 108 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Final Study Guide

    • 430 Words
    • 2 Pages

    A total of 3,150 minutes of assembly time and 2,100 minutes of testing time are available next week.…

    • 430 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The number of hours available on each machine type is 40 times the number of machines. All the constraints are dimensioned in hours. For machine 1, for example, we have 40 hrs./machine  4 machines = 160 hrs.…

    • 1346 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Absolute Level Company

    • 703 Words
    • 3 Pages

    Product Line – full line of levels; 85 models; 12 models account for over 50% of sales and which are manufactured for stock; all other units are made against orders on hand; largest sellers are aluminum level (in 4 lengths) and metal-bound level (in 7 lengths). Levels are used in determining grades in laying foundations, brick walls, and tile pipes. The production of levels is highly cyclical, broadly following the trend of the construction activity. In normal times, competition is severe.…

    • 703 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Management Stategic

    • 1060 Words
    • 5 Pages

    the teoritical minimum number of workstations (Nt) required to satisfy the cycle time constraint using the formula Nt = Sum of tasks times ( T ) Cycle time ( C )  Select a primary…

    • 1060 Words
    • 5 Pages
    Good Essays