Cost Performance on Project S Often Poor, What Are the Possible Causes of This and How Can It Be Improved?
‘’Cost performance on project s often poor, what are the possible causes of this and how can it be improved?’’

Introduction
The cost planning is one of important phases for project management. It will goes through whole project’s life cycle. It is foundation of project and it will tell the project are measured, reported and controlled in every process. Estimating is the process of forecasting or approximating the time and cost of completing project deliverables.
A successful project management will include time control and cost planning. Accompany with these two important features, and then bring out the best quality project.
Causes of poor cost performance
According to many decades’ records, Morris et al. (1989) has researched more than 4,000 projects between 1959 and 1986, after this, he concluded that projects are normally poor at achieve their targets.
*From example of helicopter Comanche which is largest acquisition program in U.S. army ($ 48b). It is purpose to replace whole school of light utility reconnaissance and attack helicopters with one helicopter that makes military gears be modular designed which already used in many kind of armoured machines, it is easier to fix and replace. However, this project has begun in 1983, and it is been 5 times restructured, furthermore, it’s cost growth in product development 101% and schedule growth in product development 120%. Finally, it has been cancelled in 2004. This activity is to avoid sunk cost that done by this overrun project, economist normally suggest to do this way, because it is only suffering in early stage, and it will saves opportunity cost.
In general, this shows lack of planning, without good planning, there are several areas will affect on cost estimating, and then directly affect on cost performance that leads to delay of time and cost overrun.
Time management
Delay is the most common problem of poor cost performance in projects, from road building project to the most complex project,



References: and Bibliography: Maylor, H (2003) BORDAT, C et al., 2004. An analysis of cost overrun and time delay of INDOT projects. Joint Transport Research Program. Purdue e-pubs. FLYVBJERG, B et al., 2004. What causes cost overrun in transport infrastructureproject. Worldbank. (2007). Budget. Available: http://siteresources.worldbank.org/INTSMALLGRANTS/Resources/952489-1228423929687/Youth2Budgeting.pdf. Last accessed 10/11/2012. Sadi A. Assaf * , Sadiq Al-Hejji. (2004). Causes of delay in large construction projects. Available: http://ipac.kacst.edu.sa/edoc/2006/156957_1.pdf. Last accessed 10/11/2012. Smith, J. and Jagger, D. (2007). Building Cost Planning forthe Design Team. Available: http://zh.scribd.com/doc/36232724/Building-Cost-Planning-for-the-Design-Team. Last accessed 10/11/2012. PUSPASARI, T.R.. (2005). FACTORS CAUSING THE POOR PERFORMANCE OF CONSTRUCTION PROJECT . Available: http://eprints.utm.my/3723/2/TatianaRinaPuspasariMAD2005ABS.pdf. Last accessed 10/11/2012. Truman, D. King, P.E.. (2012). Asseessment of Problems Associated With Poor Project Management Performance. Available: http://www.long-intl.com/articles/Long_Intl_Assessment_of_Problems_Associated_with_Poor_PM_Performance.pdf. Last accessed 10/11/2012. NASA. (2008). 2008 NASA Cost Estimating Handbook. Available: http://www.nasa.gov/pdf/263676main_2008-NASA-Cost-Handbook-FINAL_v6.pdf. Last accessed 10/11/2012. Ambituuni, A. (2011). Five Causes of Project Delay and Cost Overrun, and Their MitigationMeasures . Available: http://www.academia.edu/904386/Causes_of_Project_Delay_and_Cost_Overrun_and_Mitigation_Approach. Last accessed 10/11/2012.

You May Also Find These Documents Helpful

  • Better Essays

    Mgmt404 Project Plan

    • 1494 Words
    • 6 Pages

    I have made a list of all areas that might cause project delays or failure with their respective outcomes (see numerical list below). The five risks I have chosen…

    • 1494 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Mcbride Financial Services

    • 4240 Words
    • 17 Pages

    References: APEGBC, (2009). Project Cost Control Basics. Retrieved July 22, 2010 from APGE website at…

    • 4240 Words
    • 17 Pages
    Powerful Essays
  • Satisfactory Essays

    Bmgt 485 Ch 5

    • 300 Words
    • 2 Pages

    What are the major types of costs? Which costs are controllable by the project manager?…

    • 300 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Annotated Bibliography

    • 680 Words
    • 3 Pages

    Assaf, S.A. and Al-Hejji, S. (2006) Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-57.…

    • 680 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    DIA ABS Project Analysis

    • 4241 Words
    • 35 Pages

    References: 1. Belassi, W. & Tukel, O. I. (1996). A new framework for determining critical…

    • 4241 Words
    • 35 Pages
    Powerful Essays
  • Good Essays

    Investiong in Tufs

    • 524 Words
    • 3 Pages

    Another thing that went wrong in the project is the imbalance between its scope and the scheduling of the project as result of the management pressure to produce fast result regardless of what feasible. This problem would have avoided if the scheduling of the project take into account what was possible more than what was desired given the scheduling of the project.…

    • 524 Words
    • 3 Pages
    Good Essays
  • Best Essays

    Pinto, J.,and Mantel, S., (1990). "The Causes Of Project Failure," IEEE Transactions on Engineering Management, EM-37, 4: pp 269-276.…

    • 4232 Words
    • 17 Pages
    Best Essays
  • Best Essays

    Grant, K. P. et al. (2006, November-December). Delivering projects on time: Risk management can help managers anticipate the delays that make their development projects late. Research-Technology Management.…

    • 3043 Words
    • 13 Pages
    Best Essays
  • Best Essays

    Project Report Example

    • 4678 Words
    • 19 Pages

    Zwikael, O. (2009). Critical planning processes in construction projects. Construction Innovation: Information, Process, Management, 9(4), pp.372-387.…

    • 4678 Words
    • 19 Pages
    Best Essays
  • Powerful Essays

    COST PERFORMANCE FOR BUILDING CONSTRUCTION PROJECTS IN KLANG VALLEY A.S. Ali*, S.N. Kamaruzzaman University of Malaya, Faculty of Built Environment Building Performance and Diagnostic Group 50603 Kuala Lumpur, Malaysia Tel: +603-7967 4494 Fax: 603-7967 5713 Corresponding Author: asafab@um.edu.my Abstract Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive…

    • 4232 Words
    • 17 Pages
    Powerful Essays
  • Best Essays

    System Thinking

    • 4111 Words
    • 17 Pages

    Walker, A. (2007). Project Management in Construction. Oxford: Blackwell Publishing. Williams, T., Klakegg, O.J., Walker, D.H.T., Andersen, B., & Magnussen, O.M., (2012). Identifying and Acting on Early Warning Signs in Complex Projects. Project Management Journal, 43(2), pp. 37-53. Winch, G. M., (2010). Managing Construction Projects. London: Blackwell.…

    • 4111 Words
    • 17 Pages
    Best Essays
  • Better Essays

    Budgeting

    • 1565 Words
    • 7 Pages

    CIMA (2009) says better management accounting can help solve the common problem of mega project disasters. CIMA (2009) also states that many projects that appeared have been driven by mad geniuses and visionaries whose ability to go over budget has tested the sanity of all those involved. The best example is the Sydney Opera House (CIMA, 2009). It was one of the world’s most famous buildings which eventually went one thousand and four hundred percent over budget and sadly broke the career of architect (CIMA, 2009). Nine out of ten of all mega projects around the world go over budget, many by astronomical amounts (CIMA, 2009). The cost overrun has been constant over the seventy year period that we have been able to generate data which says about the profession of cost estimators (CIMA, 2009). Cost, time overrun, benefit, demand and revenue shortfall are the problems of budget does not hit the target for the mega projects (CIMA, 2009).…

    • 1565 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    project cost analysis

    • 1041 Words
    • 4 Pages

    To make cost estimates, project managers use cost analysis; a discipline that attempts to forecast the ultimate cost of a project. The difficulty about this analysis, especially for complex projects, is that there are a lot of uncertainties about cost items such as technology, productivity of human resources, economic conditions, market conditions, prices, inflation and other future risks and events. In general uncertainty occurs for a number of reasons:…

    • 1041 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    artificial intelligence

    • 499 Words
    • 2 Pages

    2. Lack of experience and technical skills that leads to low quality of building construction.…

    • 499 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    MBA student

    • 19652 Words
    • 79 Pages

    Baker, B.N., Murphy, D.C. & Fisher, D. (1983). ‘Factors affecting project success’ in D.I Cleland & D.R.King (eds), Project Management Handbook, New York: Van Nostrand, 669-685.…

    • 19652 Words
    • 79 Pages
    Good Essays